SECONDARY CONTROL VALVE BODY INSTALLATION [FS5A-EL]


id051721807600

On-Vehicle Installation

1. Install the tubular pin and O-ring to the transaxle case.

2. Install the secondary control valve body component and ground.

Tightening torque
7.8-10.8 N·m
{80-110 kgf·cm, 70-95 in·lbf}
Bolt length (measured from below the head)
B: 40 mm {1.575 in}
C: 50 mm {1.967 in}

3. Match the harness colors, then connect the solenoid connector.

Spring

Color of connector (harness side)

Pressure control solenoid B
White
Shift solenoid F
Black

4. Apply a light coat of silicon sealant to the contact surfaces of the oil cover and transaxle case.

5. Install the oil cover.

Tightening torque
7.8-10.8 N·m {80-109 kgf·cm, 70-95 in·lbf}

6. Install the bracket in the figure.

Tightening torque
18-26 N·m {1.9-2.6 kgf·m, 14-19 ft·lbf}

7. Install the battery and battery tray.

8. Connect the negative battery cable.

9. Add ATF. (See AUTOMATIC TRANSAXLE FLUID (ATF) REPLACEMENT [FS5A-EL].)

10. Carry out the mechanical system test. (See MECHANICAL SYSTEM TEST [FS5A-EL].)

11. Carry out the road test. (See ROAD TEST [FS5A-EL].)