1. Disconnect the negative battery cable.
2. Discharge the refrigerant from the system. (See REFRIGERANT RECOVERY.) (See REFRIGERANT CHARGING.)
3. Drain the engine coolant. (See ENGINE COOLANT REPLACEMENT [MZR-CD (RF Turbo)].)
4. Remove the dashboard. (See DASHBOARD REMOVAL/INSTALLATION.)
5. Remove the theft-deterrent control module. (See THEFT-DETERRENT SIREN REMOVAL/INSTALLATION.)
6. Remove in the order indicated in the table. Do not allow compressor oil to spill.

|
1
|
Heater hose
|
|
2
|
Cooler pipe No.4 (L.H.D.) or cooler pipe No.5 (R.H.D.)
|
|
3
|
Cooler pipe No.3
|
|
4
|
A/C unit
|
7. Install in the reverse order of removal.
8. Perform the refrigerant system performance test.