TRANSAXLE SUPPORT INSULATOR LOWER (REAR) INSTALLATION[LA4AX-EL (CD4E)]


id051708805200

1.  Install a new mount and bolts.

atraaw00002655

(1)  Install the mount.
(2)  Temporarily tighten the bolt for correct alignment.
Note
•  Before tightening the mount nuts, install the mount bolt for correct alignment.
(3)  Install the nuts and bolts.

2.  Install the bolts to the rack.

atraaw00002656

3.  Install the air cleaner component.

atraaw00002570

4.  Install the air hose and air cleaner cover.

atraaw00002383

5.  Connect the crankcase vent hose and MAF sensor connector.

atraaw00002382

6.  Verify that there is no blockage or kinks, and the vent hose routing is correct.

7.  Install the battery and battery tray. (See BATTERY REMOVAL/INSTALLATION[AJ (3.0L Duratec)].)

8.  Connect the negative battery cable.

Note
•  If the battery has been disconnected then reconnected, the vehicle may need to be driven 160 km {100 miles} or more for the PCM to relearn the control strategy.