Diagnostic procedure
STEP
|
INSPECTION
|
ACTION
|
|
---|---|---|---|
1
|
Is the line pressure normal?
(See Line Pressure Test.)
|
Yes
|
Go to the next step.
|
No
|
Repair or replace any malfunctioning parts according to the inspection results.
|
||
2
|
Is the stall speed normal?
(See Stall Speed Test.)
|
Yes
|
Go to the next step.
|
No
|
Repair or replace any malfunctioning parts according to the inspection results.
|
||
3
|
Connect the WDS or equivalent to DLC-2.
Access TFT and TFTV PIDs.
Drive the vehicle while monitoring PIDs.
(See PCM INSPECTION [L3 R.H.D.].)
Are the PIDs within the specification?
|
Yes
|
Go to the next step.
|
No
|
Inspect the TFT sensor and related wiring harness: for intermittent open/short circuit during vibration.
|
||
4
|
Connect the WDS or equivalent to DLC-2.
Access TRD, TP, TSS and VSS PIDs.
Drive the vehicle in D range while monitoring PIDs (O/D OFF switch off).
(See PCM INSPECTION [L3 R.H.D.].)
Are the PIDs within the specification?
|
Yes
|
Go to the next step.
|
No
|
TRD PID:
• Inspect the TR switch and related wiring harness: for intermittent open/short circuit during vibration.
TP PID:
• Inspect if output signal from the TP sensor changes smoothly.
TSS PID:
• Inspect the input/turbine speed sensor and related wiring harness: for intermittent open/short circuit during vibration.
VSS PID:
• Inspect for intermittent open circuit of the VSS and related wiring harness.
|
||
5
|
Turn the ignition switch to the ON position.
Connect the WDS or equivalent to DLC-2.
Simulate 3-2SOL PID for ON.
Is the 3-2 timing solenoid operating sound heard?
|
Yes
|
Replace the control valve body and repair or replace any malfunctioning parts.
(See ATX Workshop Manual (GF4AX-EL))
If any problem remains, replace the transaxle and repair or replace any malfunctioning parts.
(See ATX Workshop Manual (GF4AX-EL))
|
No
|
Inspect connection of 3-2 timing solenoid valve terminal on the ATX for bent terminals, damage, corrosion or looseness.
Is the 3-2 timing solenoid valve stuck.
If the shift solenoids are normal, inspect for open or short circuit between the PCM terminal 39 and the 3-2 timing solenoid valve terminal E.
|
||
6
|
• Verify the test results.
|