Test E
PINPOINT TEST E: TURBINE SHAFT SPEED (TSS), INTERMEDIATE SHAFT SPEED (ISS), AND OUTPUT SHAFT SPEED (OSS) SENSORSStep E1:
Steps E1 - E3:
Step E3:
NOTE: Refer to the turbine shaft speed (TSS), intermediate shaft speed (ISS), and output shaft speed (OSS) sensor connector illustrations. Transmission Connector Layouts