Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la
If it fails: lemon-manuals.org.ua

Or, hide this message: temporarily or permanently

Power Distribution Relay: Testing and Inspection

Power Relay Test

Use this chart to identify the type of relay, then do the test listed for it.






NOTE: The following relays are part of the relay control module: PGM-FI main relay 1, ignition coil relay, PGM-FI subrelay and ETCS relay. To test these relays, go to relay control module test. Testing and Inspection

Normally-open type

Check for continuity between the terminals.

- There should be continuity between the No. 1 and No. 2 terminals when battery positive terminal is connected to the No. 4 terminal, and battery negative terminal is connected to the No. 3 terminal.
- There should be no continuity between the No. 1 and No. 2 terminals when power is disconnected.