Secondary Air Injection (AIR) Solenoid Valve -N112-, Checking
Secondary Air Injection (AIR) Solenoid Valve-N112- Checking
Recommended special tools and equipment
- V.A.G 1526A multimeter
- V.A.G 1527 B Voltage Tester
- V.A.G 1594A connector test kit
- V.A.G 1598/31 test box
Test requirements:
- Fuse for Secondary Air Injection (AIR) solenoid valve OK
- Fuel Pump (FP) Relay OK
- Ignition switched off.
NOTE: Voltage is supplied to Secondary Air Injection (AIR) Solenoid Valve -N112- via the Fuel Pump (FP) relay.
Procedure
- Remove front engine cover (arrows -1- and -2-).
- Bring lock carrier into service position.
Checking internal resistance
- Disconnect electrical harness connector from Secondary Air Injection (AIR) Solenoid Valve -N112- -arrow-.
- Connect multimeter at valve for resistance measurement.
- Specified value: 19 to 27 Ohms
If specified value is not obtained.
- Replace Secondary Air Injection (AIR) Solenoid Valve -N112-.
If specified value is obtained:
Checking voltage supply
- Connect V.A.G 1527B voltage tester as follows.
Harness connector Terminal Measure to
1 Engine Ground (GND)
- Operate starter briefly.
- LED must light up.
If LED does not light up:
- Check wire connection from harness connector terminal 1 to Fuel Pump (FP) Relay -J17- via fuse for open circuit according to wiring diagram.
- Specified value: Wire resistance max 1.5 Ohms
- If necessary, repair wire connection.
If LED lights up:
Checking control wire
- Connect test box to wiring harness of Engine Control Module (ECM), ECM is not connected.
- Check the following wire connection for open circuit according to wiring diagram.
Harness connector Terminal Test box Socket
2 44
Specified value: Wire resistance max 1.5 Ohms
- Check the wire for short circuit to B+ and Ground (GND).
- Specified value: Infinite Ohms (no continuity)
- If necessary, repair wire connection.
If no malfunctions are found in wire:
- Replace Engine Control Module (ECM).
- Install lock carrier with attachments.
- Place impact for torque support on rubber buffer for torque support, letting it rest under its own weight and tighten bolts - arrows- to 28 Nm.
- Install front bumper.
- Adjust headlights.
Final procedures
After repair work, the following work steps must be performed in the mentioned sequence:
1. Check DTC memory
2. If necessary, erase DTC memory
3. Generate readiness code.
- End diagnosis and switch ignition off.