ATF Auxiliary Cooler Assembly Overview
ATF Auxiliary Cooler Assembly Overview
A - Auxiliary ATF cooler
• Removing and installing, refer to => [ ATF Auxiliary Cooler ] ATF Auxiliary Cooler
• After removing, installing or draining the ATF auxiliary cooler, always check the ATF level one more time, refer to => [ ATF Level, Vehicles with Auxiliary ATF Cooler, Checking ] ATF Level, Vehicles With Auxiliary ATF Cooler, Checking
1 - O-ring
• Replace
• Insert with ATF
2 - Bolt, 5 Nm
3 - Bolt, 25 Nm
• Before tightening bolt, install the ATF line all the way on by hand.
4 - Bolt, 10 Nm
5 - Bolt, 5 Nm
6 - Union nut - 29 Nm
7 - O-ring
• Replace
• Insert with ATF
8 - Bolt, 5 Nm
• Before tightening bolt, install the ATF line all the way on by hand.