Operation CHARM: Car repair manuals for everyone.

Diagram 1/9 (Tracks 99-112)






IMPORTANT NOTE:
This manufacturer uses "Track" style wiring diagrams.
For information on how to use these diagrams effectively, please refer to Diagram Information and Instructions. Diagram Information and Instructions


Access/Start Authorization Switch, Access/Start Control Module





ws = white
sw = black
ro = red
br = brown
gn = green
bl = blue
gr = grey
li = lilac
ge = yellow
or = orange
rs = pink

E415 - Access/Start Authorization Switch Access/Start Authorization System Assembly Overview

F305 - Transmission Park Selector Switch Selector Mechanism Overview

J217 - Transmission Control Module (TCM) Overview of Control Modules

J248 - Diesel Direct Fuel Injection (DFI) Engine Control Module (ECM)

J518 - Access/Start Control Module Overview of Control Modules

J623 - Engine Control Module (ECM) Overview of Control Modules

N110 - Shift Lock Solenoid Selector Mechanism Overview

R111 - Antenna Amplifier 2 Locations

T2l - Double Connector, black, on shift lock solenoid

T2r - Double Connector (Connector D), on access/start authorization switch

T4i - 4-Pin Connector, black, in center console on selector lever console

T6n - 6-Pin Connector, black (Connector B), on access/start authorization switch

T8i - 8-Pin Connector, black (Connector A), on access/start authorization switch

T16c - 16-Pin Connector, black, on transmission control module (TCM)

T17a - 17-Pin Connector, red, connector station electronics box in left plenum chamber Overview of Connector Stations and Connectors

T17c - 17-Pin Connector, white, connector station electronics box in left plenum chamber Overview of Connector Stations and Connectors

T20e - 20-Pin Connector, black, on transmission control module (TCM)

T20h - 20-Pin Connector, black (Connector A), on access/start control module

(E26) - Connection (selector lever P/N) (in Motronic wiring harness)

* - Models with automatic transmission 09L

** - Models with automatic transmission 01J

# - => Wiring Diagram Engine

- Through October 2005

♦♦ - From November 2005

Previous Diagram 1/8 (Tracks 85-98)

Next Diagram 1/10 (Tracks 113-126)