Operation CHARM: Car repair manuals for everyone.

Engine: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Complete Assembly With Transfer of Parts9.50.0BIncludes: Transfer All Fuel And Electrical Units. Does Not Include: Transfer Of Optional Equipment.
NOTE
With AC, Add1.00.0B
With Locking Wheel Covers, Add0.20.0B
With Locking Lug Nuts, Add0.20.0B
Complete Assembly Without Transfer of Parts7.00.0BDoes Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment.
NOTE
With AC, Add1.00.0B
With Locking Wheel Covers, Add0.20.0B
With Locking Lug Nuts, Add0.20.0B
Long Block13.70.0AIncludes: R&R Engine And Transfer All Necessary Components Not Supplied With Long Block.
NOTE
With AC, Add1.00.7B
With Locking Wheel Covers, Add0.20.1B
With Locking Lug Nuts, Add0.20.0B
Short Block17.70.0AIncludes: R&R Engine And Trasnfer All Necessary Components.
NOTE
With AC, Add1.10.8A
With Locking Wheel Covers, Add0.20.1A
With Locking Lug Nuts, Add0.20.0A
Overhaul/Rebuild24.20.0AIncludes: Disassemble And Clean Engine. Ridge Ream & Hone Cylinders, Fit Pistons, Rings, Pins, Main & Rod Bearings, Grind Valves And Tune-up.
NOTE
With AC, Add1.10.8A
With Locking Wheel Covers, Add0.20.1A
With Locking Lug Nuts, Add0.20.0A