Operation CHARM: Car repair manuals for everyone.

Instrument Panel (IP) - Switch Bank Replacement




REMOVAL PROCEDURE
1. Remove the IP cluster trim panel.
2. Remove the panel lights/twilight sentinel/traction control switch (4) fasteners.
3. Pull rearward on the switch in order to remove the switch.

INSTALLATION PROCEDURE
1. Install the panel lights/twilight sentinel/traction control switch (4).

NOTE: Refer to Fastener Notice in Cautions and Notices.

2. Install the switch fasteners.

Tighten
Tighten the fasteners to 1.9 N.m (17 lb in).

3. Install the IP cluster trim panel.