Operation CHARM: Car repair manuals for everyone.
Do you have access to Mitchell1 Prodemand? If you are willing to share user/password (we can pay $250), please get in contact with us ASAP: email operation-charm [[at]] tuta.io or click to submit anonymously

Power and Ground

The head-up display (HUD) control module receives ignition positive voltage at terminal 11 (CKT 1141, BRN). The HUD control switch receives ignition positive voltage at terminal 6 (CKT 1141, BRN). The HUD control module is grounded at terminal 12 (CKT 251, BLK/WHT). The HUD control switch is grounded at terminal 10 (CKT 251, BLK/WHT).