Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank11.88.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank10.88.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks14.710.2AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cyls
Right Bank13.79.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank14.710.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks21.314.9AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.60.0A
Oil Pump, Renew0.80.0A
Tune Up0.90.0A
Timing Chain or Gears, Renew1.30.0A
Note
To Grind Valves, Add
One Bank1.10.8A
To Replace Main Bearings, Add1.41.0A