Instrument Panel Compartment - Replacement (Base and DHS)
Compartment Replacement - IP (Base and DHS)
Removal Procedure
1. Remove the left knee bolster. Refer to Knee Bolster Replacement - Left (Without UV2) (Knee Bolster Replacement - Left (Without RPO UV2))Knee Bolster Replacement - Left (UV2) (Knee Bolster Replacement - Left (With RPO UV2)) .
2. Remove the right knee bolster. Refer to Knee Bolster Replacement - Right (Knee Bolster Replacement - Right) .
3. Remove the four fasteners (2) retaining the center storage compartment (1).
4. Disconnect the electrical connector if equipped.
5. Remove the center compartment (1).
Installation Procedure
1. Connect the electrical connector, if equipped.
2. Install the center compartment (1).
Notice: Refer to Fastener Notice in Cautions and Notices.
3. Install the four fasteners (2) that retain the center storage compartment (1).
Tighten the fasteners (2) to 9 N.m (80 lb in).
4. Install the left knee bolster. Refer to Knee Bolster Replacement - Left (Without UV2) (Knee Bolster Replacement - Left (Without RPO UV2))Knee Bolster Replacement - Left (UV2) (Knee Bolster Replacement - Left (With RPO UV2)) .
5. Install the right knee bolster. Refer to Knee Bolster Replacement - Right (Knee Bolster Replacement - Right) .