Connecting Rod: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Add Following Operations If Performed With Piston & Ring Jobs | ||||
| Crankshaft, Renew | 0.2 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| Tune-Up | 0.5 | 0.0 | A | |
| Note | ||||
| To Grind Valves, Add | 2.1 | 0.0 | A | |
| One CYL | 12.0 | 0.0 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Each Additional | 0.7 | 0.0 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| All Cyls | 13.3 | 0.0 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |