| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Resurface/Grind |
| Head Removed | 2.3 | 1.3 | A | |
| All Cyls | 7.1 | 5.1 | B | Includes: R&R Cylinder Head, Clean Carbon And Make All Necessary Adjustments. |
| Note |
| With PS, Add | 0.4 | 0.2 | A | Includes: R&R Cylinder Head, Clean Carbon And Make All Necessary Adjustments. |
| Add the Following Operations If Performed With Valves, Grind |
| Valve Guides, Knurl |
| Each | 0.2 | 0.0 | A | Add The Following Operations If Performed Along With Valves Grind. |
| Timing Belt, Renew | 0.8 | 0.0 | A | Add The Following Operations If Performed Along With Valves Grind. |
| Rocker Arm Stud, Renew |
| Each | 0.3 | 0.0 | A | Add The Following Operations If Performed Along With Valves Grind. |
| Valve Lifters, Renew | 0.5 | 0.0 | A | Add The Following Operations If Performed Along With Valves Grind. |
| Camshaft, Renew | 1.3 | 0.0 | A | Add The Following Operations If Performed Along With Valves Grind. |
| Valves Guides, Renew |
| Each | 0.3 | 0.0 | A | Add The Following Operations If Performed Along With Valves Grind. |
| Note |
| To Ream Guide, Add | 0.1 | 0.0 | A | Add The Following Operations If Performed Along With Valves Grind. |