| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| One Cylinder |
| Right Bank | 12.4 | 8.4 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Left Bank | 12.6 | 8.6 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Both Banks | 15.7 | 10.7 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| All Cylinders | 18.9 | 11.9 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Each Additional | 1.0 | 0.7 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Crankshaft, Renew | 4.0 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Operations. |
| Main Bearings | 1.0 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Operations. |
| Oil Pump, Renew | 0.8 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Operations. |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Operations. |
| Rear Main Oil Seal, Renew | 1.4 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Operations. |
| Timing Chain or Gear, Renew | 1.5 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Operations. |
| Tune-Up | 0.6 | 0.0 | A | See Valves, Grind (Head Removed) & Combinations. |