Operation CHARM: Car repair manuals for everyone.

Glass (Door) - Remains Outboard of Blow-Out Clip

88chevy18

Number: 88-331-10

Section: 10
Date: SEPT., 1988
Subject: DOOR GLASS REMAINS OUTBOARD OF BLOW-OUT CLIP


Model and Year: 1988 CAVALIER CONVERTIBLE

FIGURE 1:




TO: ALL CHEVROLET DEALERS

INSPECT (FIGURE 1)

1. With top latched to windshield header and door glass in full up position, top side rails must exhibit a slight over-crown relation to top edge of door glass.

2. Open and close door, door glass should pass under side rail blow out clip and seal against side rail weatherstrips. If door glass remains outboard of blow-out clip the side rail may be adjusted as follows:

NOTICE: WHEN RAISING OR LOWERING TOP DURING ADJUSTMENTS ALL SIDE WINDOWS MUST BE LOWERED.

FIGURE 2 - CONTROL LINKAGE ADJUSTMENTS:




SIDE RAIL (FIGURE 2)

1. Unlatch top from windshield header.

2. Operate top to half-lowered position.

3. Loosen side rail adjusting screw lock nut.

4. The following adjustments can now be made:

A. To increase the amount of crown in side rail rotate adjusting screw counterclockwise.

B. To decrease the amount of crown in side rail rotate adjusting screw clockwise.

5. Tighten side rail adjusting screw lock nut to hold side rail adjusting screw in position.
6. Raise top to windshield header. Do Not latch top to windshield header.

INSPECT

Top No. 1 bow alignment to windshield header. Top No. 1 bow must stand off windshield header approximately one inch, if not the top linkage can be adjusted as follows:

TOP LINKAGE

ADJUST (FIGURE 2)

1. Loosen eccentric pin nut while holding the eccentric pin in position.

2. Rotate eccentric pin until No. 1 bow lifts off windshield header and dowel pins align with dowel pin holes in header lock moldings.

3. Tighten eccentric pin nut while holding eccentric pin in position.

INSPECT

1. Lower top and then raise top to check operation and alignment as No. 1 bow meets windshield header.

2. Latch top to windshield header-and raise door glass. Check alignment of side rail to top edge of door glass.

3. Open and close door, door glass should pass under side rail blow out clip and seal against side rail weatherstrips.
Labor Operation Number: B3980
Labor Time : .7 Hours