Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.40.0A
Crankshaft, Renew3.00.0ADoes Not Include: R&R Engine.
Oil Pump, Renew0.80.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew1.00.0A
Timing Chain or Gears, Renew1.90.0A
Tune-Up0.60.0A
One Cylinder
Right Bank11.88.4AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Each Bank16.812.0A
Left Bank10.97.8AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Note
With AC, Add0.70.4A
With Cruise Control, Add0.40.2A
With PS, Add0.50.3A
All Cylinders19.513.9A
Note
With AC, Add0.70.4A
With Cruise Control, Add0.40.2A
With PS, Add0.50.3A