Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
Right Bank11.88.4AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Each Bank16.812.0A
Left Bank10.97.8AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Note
With AC, Add0.70.4A
With PS, Add0.50.3A
With Cruise Control, Add0.40.2A
All Cylinders19.513.9A
Note
With AC, Add0.70.4A
With Cruise Control, Add0.40.2A
With PS, Add0.50.3A
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.40.0A
Crankshaft, Renew3.00.0ADoes Not Include: R&R Engine.
Oil Pump, Renew0.80.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew1.00.0A
Timing Chain or Gears, Renew1.90.0A
Tune-Up0.60.0A