Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank10.87.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank9.86.9AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks13.79.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Each Additional0.70.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cyls
Right Bank11.88.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank10.87.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks15.711.1AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.00.0A
Crankshaft, Renew
Manual Trans5.30.0A
Auto Trans5.10.0A
Oil Pump Screen, Clean0.30.0A
Oil Pump, Renew0.50.0A
Rear Main Oil Seal, Renew
Manual Trans2.60.0A
Auto Trans2.20.0A
Timing Chain, Renew1.80.0A
Valve Lifters, Renew
Right Bank2.40.0A
Left Bank2.40.0A
Both Banks2.60.0A
Camshaft, Renew
Manual Trans5.00.0A
Auto Trans4.70.0A
Note
To Grind Valves, Add2.82.0A