Pressure Relief Valve
Compressor Rear View:
Remove or Disconnect
1. Recover refrigerant.
2. Remove old pressure relief valve.
Install or Connect
1. Lubricate O-ring of new pressure relief valve and O-ring assembly with new 525 viscosity refrigerant oil. Install new valve and torque in place, 16.0 N.m (11.7 lbs.ft.).
2. Evacuate and recharge the system.
3. Leak test system.