Piston: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Each Additional | 1.0 | 0.7 | A | |
| Add Following Operations If Performed With Piston & Ring Jobs | ||||
| Main Bearing, Renew | 1.6 | 0.0 | A | |
| Crankshaft, Renew | 5.7 | 0.0 | A | |
| Oil Pump, Renew | 0.9 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| Rear Main Seal, Renew | ||||
| Manual Trans | 1.8 | 0.0 | A | |
| Auto Trans | 2.2 | 0.0 | A | |
| Timing Chain, Renew | 2.5 | 0.0 | A | |
| Tune-Up | 0.8 | 0.0 | A | |
| Valve Lifters, Renew | ||||
| Right Bank | 1.4 | 0.0 | A | |
| Left Bank | 1.5 | 0.0 | A | |
| Both Banks | 1.8 | 0.0 | A | |
| Camshaft, Renew | 3.9 | 0.0 | A | |
| One Cylinder | ||||
| Right Bank | 9.8 | 7.3 | A | |
| Left Bank | 11.8 | 8.1 | A | |
| Both Banks | 16.7 | 12.0 | A | |
| All Cylinders | ||||
| Right Bank | 12.7 | 9.4 | A | |
| Left Bank | 14.7 | 10.2 | A | |
| Both Banks | 22.5 | 15.9 | A | |
| Note | ||||
| To Grind Valves, Add | 3.8 | 2.7 | A |