Do you have access to Mitchell1 Prodemand? If you are willing to share user/password (we can pay $250), please get in contact with us ASAP: email operation-charm [[at]] tuta.io or click to submit anonymously. (This is the last day we'll be asking)
Automatic Transmission - Allison
Park/Neutral Position Switch ReplacementPNP Switch Removal
Refer to Park/Neutral Position Switch Removal.
PNP Switch Install
Refer to Park/Neutral Position Switch Installation.
7. Notice:
Refer to Transmission Selector Shaft Abuse Notice in Service Precautions.
Reinstall shift lever (2). Install nut (3), by hand, on the end of selector shaft (4). Use a wrench (1) to keep the shift lever from rotating.
^ Tighten nut (3) to 24 Nm (18 ft. lbs.).
8. Reconnect the shift selector linkage/cable to the shift lever (2).
9. Connect the external wiring harness to the PNP switch.