Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
Right Bank26.318.8AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
Left Bank26.318.9AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
Both Banks31.322.1AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
Each Additional0.40.3AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
All Cylinders
Right Bank27.920.2AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
Left Bank27.920.3AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
Both Banks34.70.0AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
NOTE
To R&R Piston, Pin or Connecting Rod, Add
One0.20.0A
Each Additional0.10.0A
All0.80.0A
To R&R Connecting Rod Bearings, Add
Each0.10.0A