Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Throttle Full Close Switch: Testing and Inspection

Fig. 30 Idle switch test. 1987-89:






1. Disconnect electrical connector from ISC servo with ignition off.
2. Check for continuity between connector terminal 2, Fig. 30, and injection mixer body (GND). Continuity should exist when throttle valve is in idle position and should not exist when throttle valve is opened.
3. If continuity is not as described, the ISC servo should be replaced.