Operation CHARM
: Car repair manuals for everyone.
Home
>>
Chrysler
>>
2008
>>
Aspen 2WD V8-4.7L
>>
Repair and Diagnosis
>>
Power and Ground Distribution
>>
Fuse Block
>>
Service and Repair
>>
Installation
Installation
INSTALLATION
1.
Connect wire harness connectors to the Junction Block (JB) (1).
2.
Position JB and install mounting fasteners (3).
3.
Install left cowl trim cover).
4.
Connect the battery negative cable.