Operation CHARM: Car repair manuals for everyone.
Do you have access to Mitchell1 Prodemand? If you are willing to share user/password (we can pay $250), please get in contact with us ASAP: email operation-charm [[at]] tuta.io or click to submit anonymously

Installation






INSTALLATION






NOTE:
After installing Evaporative System Integrity Monitor (ESIM) switch, the electrical connector on the switch must be in the 3 O'clock position. This step must be done for proper ESIM switch operation.

1. Install ESIM switch (3) to vapor canister (1) and rotate 1/4 turn clockwise until the lock tab (2) engages. Make sure electrical connector is in the 3 O'clock position.

2. Install vapor canister filter line (4) to ESIM switch (3).

3. Connect electrical connector (5) to ESIM switch (3).