| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| One CYL |
| One Bank | 8.3 | 0.0 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Both Banks | 11.1 | 0.0 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Note |
| With AC, Add | 0.4 | 0.0 | A | |
| With A.I.R. Pump, Add | 0.9 | 0.0 | A | |
| With 100 Amp Alternator, Add | 0.9 | 0.0 | A | |
| Each Additional | 1.0 | 0.0 | A | |
| Note |
| With AC, Add | 0.4 | 0.0 | A | |
| With 100 Amp Alternator, Add | 0.9 | 0.0 | A | |
| With A.I.R. Pump, Add | 0.9 | 0.0 | A | |
| Add Following Operations If Performed With Piston & Ring Jobs. |
| Crankshaft, Renew | 0.2 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| Tune-Up | 0.8 | 0.0 | A | |