Operation CHARM: Car repair manuals for everyone.

Secondary Throttle Lockout

Fig. 14 TQ secondary throttle lockout:





Move choke control lever to open choke position. Measure clearance between lockout lever and stop, Fig. 14. Clearance should be .060---.090 inch. Adjust by bending tang on fast idle control lever.