| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Complete Assembly Without Transfer of Parts | 9.8 | 0.0 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| Note |
| With AC, Add | 0.4 | 0.0 | B | |
| With ABS, Add | 0.4 | 0.0 | B | |
| Complete Assembly With Transfer of Parts | 11.8 | 0.0 | B | Includes: Transfer Of All Fuel & Electrical Units, Does Not Include Transfer Of Optional Equipment. |
| Note |
| With AC, Add | 0.4 | 0.0 | B | |
| With ABS, Add | 0.4 | 0.0 | B | |
| Long Block | 16.3 | 0.0 | B | Includes: R&I Engine & Transfer Of All Necessary Components. |
| Note |
| With AC, Add | 0.4 | 0.2 | B | |
| With ABS, Add | 0.4 | 0.2 | B | |
| Short Block | 19.3 | 10.2 | A | Includes: R&I Engine & Transfer Of All Necessary Components. |
| Note |
| To Replace Cylinder Head, Add |
| One Bank | 1.8 | 1.3 | A | |
| Both Banks | 3.5 | 2.5 | A | |
| To Grind Valves, Add | 3.2 | 2.3 | A | |
| With AC, Add | 0.4 | 0.2 | A | |
| With ABS, Add | 0.4 | 0.2 | A | |
| Overhaul/Rebuild | 30.2 | 0.0 | A | Includes: Disassemble & Clean Engine, Ridge Ream & Hone Cylinders. Inspect And Replace All Necessary Components, Grind Valves & Tune-Up. |
| Note |
| With AC, Add | 0.4 | 0.0 | A | |
| With ABS, Add | 0.4 | 0.0 | A | |