| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Tune-Up | 1.4 | 0.0 | B | Includes: R&I Transaxle Oil Pan, Service Filter And Make All Necessary Adjustments. |
| Diagnose/Test |
| 4 Speed, A604, 41AE, 41TE |
| Electronic Trans, Diagnosis | 1.8 | 0.0 | A | Includes: Time To Hook-Up And Disconnect Test Equipment. Checking System For Fault Codes, Road Test And Hydraulic Pressure Test As Required. |
| Replace |
| 3 Speed - A670/31TH |
| Complete Assembly Without Transfer Of Parts | 4.0 | 2.9 | B | |
| Complete Assembly With Transfer Of Parts | 4.6 | 3.1 | B | Includes: R&I Transaxle. |
| NOTE |
| To R&R Rear Main Seal, Add | 0.5 | 0.3 | B | |
| To R&R Front Pump Oil Seal, Add | 0.4 | 0.2 | B | |
| To R&R Driveplate, Add | 0.2 | 0.2 | B | |
| To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
| To Flush Cooler Lines, Add | 0.6 | 0.0 | B | |
| 4 Speed - A604, 40TE, 41AE, 41TE |
| Complete Assembly Without Transfer of Parts | 5.9 | 3.1 | B | |
| Complete Assembly With Transfer of Parts | 6.5 | 3.3 | B | Includes: R&I Transaxle. |
| NOTE |
| To R&R Rear Main Seal, Add | 0.5 | 0.3 | B | |
| To R&R Front Pump Oil Seal, Add | 0.4 | 0.2 | B | |
| To R&R Driveplate, Add | 0.2 | 0.2 | B | |
| To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
| To Flush Cooler Lines, Add | 0.6 | 0.0 | B | |
| Overhaul/Rebuild |
| 3 Speed - A670/31TH | 9.8 | 7.1 | A | Includes: R&I Transaxle. |
| 4 Speed - A604, 40TE, 41AE, 41TE | 12.7 | 7.9 | A | Includes: R&I Transaxle. |
| NOTE |
| To Overhaul Valve Body, Add | 1.9 | 1.7 | A | |
| To Overhaul Differential, Add | 1.5 | 0.0 | A | |
| To R&R Torque Converter, Add | 0.2 | 0.0 | A | |
| To Flush Cooler Lines, Add | 0.6 | 0.0 | A | |