| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Diagnose/Test |
| Compression, Test | 1.6 | 0.0 | B | Includes: R&I Spark Plugs. |
| Replace |
| Complete Assembly Without Transfer of Parts | 8.4 | 0.0 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| NOTE |
| With AC, Add | 0.4 | 0.0 | B | |
| With ABS, Add | 0.4 | 0.0 | B | |
| Complete Assembly With Transfer of Parts | 10.9 | 0.0 | B | Includes: Transfer Of All Fuel & Electrical Units, Does Not Include Transfer Of Optional Equipment. |
| NOTE |
| With AC, Add | 0.4 | 0.0 | B | |
| With ABS, Add | 0.4 | 0.0 | B | |
| Long Block | 15.4 | 0.0 | B | Includes: R&I Engine & Transfer Of All Necessary Components. |
| NOTE |
| With AC, Add | 0.4 | 0.0 | B | |
| With ABS, Add | 0.4 | 0.0 | B | |
| Short Block | 18.4 | 8.7 | A | Includes: R&I Engine & Transfer Of All Necessary Components. |
| NOTE |
| With AC, Add | 0.4 | 0.2 | A | |
| With ABS, Add | 0.4 | 0.2 | A | |
| To R&R Cylinder Head, Add |
| One Bank | 2.7 | 1.9 | A | |
| Both Banks | 5.3 | 3.8 | A | |
| To Grind Valves, Add | 5.0 | 3.6 | A | |
| Overhaul/Rebuild | 28.4 | 0.0 | A | Includes: Disassemble & Clean Engine, Ridge Ream & Hone Cylinders. Inspect And Replace All Necessary Components, Grind Valves & Tune-Up. |
| NOTE |
| With ABS, Add | 0.4 | 0.0 | A | |
| With AC, Add | 0.4 | 0.0 | A | |