| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace | 12.7 | 8.8 | A | Includes: R&I Engine & Oil Pan. Renew All Bearings And Seals And Make All Necessary Adjustments. |
| NOTE |
| With Skid Plate, Add | 0.5 | 0.3 | A | |
| With PS, Add | 0.4 | 0.2 | A | |
| With Manual Trans, Add | 2.4 | 1.7 | A | |
| With 4WD, Add | 1.0 | 0.8 | A | |
| With Air Pump, Add | 0.4 | 0.2 | A | |
| To Replace Cam Bearings, Add | 2.7 | 1.9 | A | |
| To R&R Cylinder Heads, Add |
| One Bank | 1.1 | 0.8 | A | |
| Both Banks | 1.8 | 1.3 | A | |
| To Replace Cylinder Heads, Add |
| One Bank | 1.7 | 1.2 | A | |
| To Grind Valves, Add |
| One CYL | 0.5 | 0.3 | A | |
| All Cyls |
| One Bank | 1.7 | 1.2 | A | |
| Both Banks | 3.8 | 2.7 | A | |
| To Replace Connecting Rods, Add |
| One CYL | 0.8 | 0.5 | A | |
| To Replace Piston Rings, Add | 4.3 | 3.1 | A | |