P0750
P0750 - LR SOLENOID CIRCUIT
When Monitored and Set Condition:
P0750 - LR SOLENOID CIRCUIT
When Monitored: Initially at power-up, then every 10 seconds thereafter. The solenoids will also be tested immediately after a gear ratio or pressure switch error is detected.
Set Condition: Three consecutive solenoid continuity test failures, or one failure if test is run in response to a gear ratio or pressure switch error.
POSSIBLE CAUSES:
RELATED RELAY DTC'S PRESENT
INTERMITTENT WIRING AND CONNECTORS
L/R SOLENOID CONTROL CIRCUIT OPEN
TRANSMISSION RELAY OUTPUT CIRCUIT OPEN
L/R SOLENOID CONTROL CIRCUIT SHORT TO GROUND
L/R SOLENOID CONTROL CIRCUIT SHORT TO VOLTAGE
L/R - SOLENOID/TRS ASSEMBLY
TCM - L/R SOLENOID CIRCUIT