| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Diagnose/Test |
Oil Leak, Diagnosis | 1.0 | 0.5 | B | |
Replace |
Complete Assembly Without Transfer Of Parts | 7.4 | 0.0 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
NOTE |
With PS, Add | 0.4 | 0.0 | B | |
With Manual Trans, Add | 2.4 | 0.0 | B | |
With AC, Add | 1.1 | 0.0 | B | |
Complete Assembly With Transfer Of Parts | 10.9 | 0.0 | B | Includes: Transfer Of All Fuel & Electrical Units. Does Not Includes Transfer Of Optional Equipment. |
NOTE |
With PS, Add | 0.4 | 0.0 | B | |
With Manual Trans, Add | 2.4 | 0.0 | B | |
With AC, Add | 1.1 | 0.0 | B | |
Long Block | 15.4 | 0.0 | B | Includes: R&I Engine And Replacement Of All Necessary Components. |
NOTE |
With AC, Add | 1.1 | 0.0 | B | |
With PS, Add | 0.4 | 0.0 | B | |
With Manual Trans, Add | 2.4 | 0.0 | B | |
Short Block | 19.4 | 9.4 | A | Includes: R&I Engine And Replacement Of All Necessary Components. |
NOTE |
With Manual Trans, Add | 2.4 | 0.0 | A | |
With AC, Add | 1.1 | 0.0 | A | |
With PS, Add | 0.4 | 0.0 | A | |
To Replace Cylinder Head, Add |
One Bank | 1.7 | 1.2 | A | |
To Grind Valves, Add |
One CYL | 0.5 | 0.3 | A | |
All Cyls |
One Bank | 1.7 | 1.2 | A | |
Both Banks | 3.8 | 2.7 | A | |
Overhaul/Rebuild | 28.6 | 0.0 | A | Includes: Disassemble & Clean Engine, Ridge Ream & Hone Cylinders, Fit Pistons, Rings, Pins, Main & Rod Bearings, Grind Valves & Tune-Up. |
NOTE |
With PS, Add | 0.4 | 0.0 | A | |
With Manual Trans, Add | 2.4 | 0.0 | A | |
With AC, Add | 1.1 | 0.0 | A | |