Operation CHARM: Car repair manuals for everyone.

Installation






INSTALLATION - 2.4L
1. Loose install EGR tube and gasket with attaching bolts at intake manifold.

2. Loose install EGR tube and gasket with attaching bolts at EGR valve.

3. Tighten bolts to EGR valve to 11.9 Nm (105 ± 20 ins. lbs.).

4. Tighten bolts to Intake manifold to 11.9 Nm (105 ± 20 ins. lbs.).