Operation CHARM: Car repair manuals for everyone.

Installation






INSTALLATION




1. Install valve body into position and start bolts (1). Torque valve body to transmission case bolts (1) to 12 Nm (105 in. lbs.) torque.




2. Install transmission oil filter (1).





NOTE: Before installing the oil pan bolt in the bolt hole (5) located between the torque converter clutch on and U/D clutch pressure tap circuits, it will be necessary to replenish the sealing patch on the bolt using Mopar(R) Lock & Seal Adhesive.




3. Make sure oil pan (1) and case rail are clean and dry. Install an 1/8" bead of RTV to the transmission oil pan and install to case. Tighten bolts (2) to 20 Nm (14.5 ft. lbs.).




4. Lower vehicle and connect the transmission range sensor (5) connector.
5. Connect solenoid/pressure switch assembly connector.
6. Connect the variable line pressure connector (4), if equipped.
7. Lower vehicle.
8. Fill transmission with ATF+4, Automatic Transmission Fluid. Verify proper fluid level.

NOTE: If the valve body has been reconditioned or replaced, it is necessary to perform the Quick Learn Procedure.