Assembly
ASSEMBLY
NOTE: Apply trans jell or petroleum jelly to all slide portions, rolling contacts surfaces, thrust surfaces etc. to prevent burnout during initial operation. Lubricate O-rings and O-ring seals with MOPAR(R) AS68RC ATF. Soak all friction disks in MOPAR(R) AS68RC ATF for at least two hours before assembly of clutch packs.
P1 PLANETARY GEAR SET
1. Install the ring gear flange (5) into the ring gear (4).
2. Install the snap ring (6) into the ring gear (4).
3. Install the P1 planetary gear (2) and thrust bearing (3) into the ring gear assembly.
4. Install the P1 planetary gear (2) and ring gear assembly into the C3 clutch assembly (7).
P2 PLANETARY GEAR SET
1. Install the P1 hub (7) into the ring gear (8).
2. Install the snap ring (6) into the ring gear (8).
3. Install the ring gear assembly and thrust bearings (5),(9) onto the P2 planetary gear (10).
4. Install the P2 planetary gear (10), thrust bearing race (1), thrust bearing (2) and ring gear assembly onto the sun gear shaft (3).
P3 PLANETARY GEAR SET
1. Install the P2 hub (5) into the ring gear (4).
2. Install the snap ring (6) onto the ring gear assembly.
3. Install the P3 planetary gear (1), thrust bearing race (2), thrust bearing (3) into the ring gear assembly.