Operation CHARM
: Car repair manuals for everyone.
Home
>>
Dodge and Ram
>>
2008
>>
Avenger V6-2.7L
>>
Repair and Diagnosis
>>
Transmission and Drivetrain
>>
Differential Assembly
>>
Service and Repair
>>
Removal and Replacement
>>
Electronically Controlled Clutch
>>
Installation
Installation
INSTALLATION
1.
Install the ECC.
2.
Install the mounting bolts at the ECC and tighten to 60 Nm (44 ft. lbs.).
3.
Connect the electrical connector at the ECC.
4.
Install the propeller shaft
Propeller Shaft - Installation
.