Instrument Panel Center Bezel - Installation
INSTALLATION
1. Install switch bank (4) onto bezel).
2. Route cables through center bezel and connect to HVAC control head (3).
3. Connect control head (3) to center bezel.
4. Connect wire harness connectors to accessory switch bank (2).
5. Hand tap center bezel on to instrument panel to ensure proper seating.