Operation CHARM: Car repair manuals for everyone.

B1970







B1970-POWER LIFTGATE CLOSE DIRECTION - RATCHET PRIMARY SWITCH PERFORMANCE





For a complete wiring diagram Consult Diagrams/Electrical

- When Monitored:
Whenever the power liftgate is performing a power close operation.

- Set Condition:
The ratchet switch was detected as open when the Power Liftgate Drive Unit Position Sensor count was greater than 40.





Diagnostic Test

1. DTC PRESENT

NOTE: This DTC will only set during the cinching operation after the four second time out. This may make it difficult to reproduce.

With the scan tool, record and erase DTC's.
Turn the ignition off, wait 10 seconds, then turn the ignition on.
Operate the power liftgate several times if possible.
With the scan tool, read ACTIVE DTCs.
Does the scan tool display B1970-POWER LIFTGATE CLOSE DIRECTION - RATCHET PRIMARY SWITCH PERFORMANCE?

Yes

- Go To 2

No

- Using the wiring diagram/schematic as a guide, inspect the wiring and connectors for an intermittent condition. Operate the door several times and check for any binding or other obstructions.
- Perform BODY VERIFICATION TEST - VER 1.Body Verification Test.

2. BINDING LIFTGATE
Examine the liftgate for proper fit and alignment, loose/hard or torn seals, misaligned latch striker or anything that would cause an obstruction to proper operation.
Manually operate the liftgate of a known good vehicle and notice the effort needed to open and close.
Compare the effort needed on the disabled liftgate.
Especially notice the effort needed to unlatch and close the liftgate.
Does it take more effort to operate the liftgate than it should?

Yes

- Refer to applicable service information.
- Perform BODY VERIFICATION TEST - VER 1.Body Verification Test.

No

- Go To 3

3. POWER LIFTGATE MODULE
With the scan tool, monitor the PRIMARY RATCHET SWITCH.
Using a screwdriver, click the latch to the second detent while observing the scan tool.
Unlatch the latch by pressing the handle switch and observe the scan tool for a change of state.
Repeat this step several times while moving the liftgate in different positions and wiggling the harness to check for an intermittent open or shorted circuit.
Did the scan tool show the switch state changing correctly every time?

No

- Go To 4

Yes

- Replace the Power Liftgate Module.
- Perform BODY VERIFICATION TEST - VER 1.Body Verification Test.

4. (Q901) LOGIC GROUND WIRE OPEN




Turn all lights off.
Turn the ignition off.
Disconnect the Power Liftgate Latch harness connector.
Measure the resistance between ground and the (Q901) Logic Ground circuit in the Liftgate Latch harness connector.
Wiggle the harness while observing the ohmmeter.
Is the resistance below 9.5 ohms?

Yes

- Go To 5

No

- Repair the (Q901) Logic Ground wire for an open.
- Perform BODY VERIFICATION TEST - VER 1.Body Verification Test.

5. (G78) LIFTGATE AJAR SWITCH SENSE WIRE OPEN




Disconnect the Power Liftgate Module C2 harness connector.
Measure the resistance of the (G78) Liftgate Ajar Switch Sense wire between the PLG Module C2 harness connector and the Liftgate Latch harness connector.
Wiggle the harness while observing the ohmmeter.
Is the resistance below 2.0 ohms?

Yes

- Replace the Power Liftgate Latch.
- Perform BODY VERIFICATION TEST - VER 1.Body Verification Test.

No

- Repair the (G78) Liftgate Ajar Switch Sense wire for an open.
- Perform BODY VERIFICATION TEST - VER 1.Body Verification Test.