Operation CHARM
: Car repair manuals for everyone.
Home
>>
Dodge and Ram
>>
2008
>>
Nitro 2WD V6-4.0L
>>
Repair and Diagnosis
>>
Powertrain Management
>>
Emission Control Systems
>>
Positive Crankcase Ventilation
>>
Positive Crankcase Ventilation Valve
>>
Service and Repair
>>
Installation
Installation
INSTALLATION - 4.0L
1.
Check condition of PCV valve rubber O-ring.
2.
Clean
PCV
fitting.
3.
Thread and tighten PCV valve (2) into rear of valve cover (3).
4.
Install rubber
PCV
hose (1) and hose clamp to PCV valve.