Do you have access to Mitchell1 Prodemand? If you are willing to share user/password (we can pay $250), please get in contact with us ASAP: email operation-charm [[at]] tuta.io or click to submit anonymously. (I know, we said we wouldn't ask any more...but it's important!)
Installation - Front
INSTALLATION
1. Position the blower motor resistor (2) into the front HVAC housing (4).
2. Install the two screws (3) that secure the blower motor resistor to the front HVAC housing. Tighten the screws to 2 Nm (17 in. lbs.).
3. Connect the wire harness connector (1) to the blower motor resistor.
4. If equipped with a trim cover (2), install the trim cover over the blower motor resistor (3) and install the two retaining screws (1). Tighten the screws to 2 Nm (17 in. lbs.).
5. Reconnect the negative battery cable.