Operation CHARM: Car repair manuals for everyone.

D-Pillar






INSTALLATION





1. Position the third row power folding seat switch (4) into the left rear of vehicle.
2. Connect the switch electrical connector (3).
3. Push switch into upper D-Pillar trim panel (5) until retaining tabs are fully engaged.
4. Connect the battery negative cable.
5. Using an appropriate scan tool, check and erase any third row power folding seat control module diagnostic trouble codes related to the D-Pillar switch.