Floor Distribution Duct - Installation
INSTALLATION
LEFT SIDE
NOTE: Illustration shown with instrument panel removed from view for clarity.
1. Connect the left side floor ducts (1) to the HVAC housing (2). Make sure the ducts are fully engaged to the HVAC housing and each other.
2. Install the push pin (3) that secures the left side floor ducts to the instrument panel.
3. Install the left side instrument panel silencer.
RIGHT SIDE
NOTE: Illustration shown with instrument panel removed from view for clarity.
1. Connect the right side floor ducts (1) to the HVAC housing (2). Make sure the ducts are fully engaged to the HVAC housing and each other.
2. Install the right side instrument panel silencer.