Do you have access to Mitchell1 Prodemand? If you are willing to share user/password (we can pay $250), please get in contact with us ASAP: email operation-charm [[at]] tuta.io or click to submit anonymously
Front
INSTALLATION
CAUTION: Each wire connector is individually keyed to its respective receptacle on the back of the A/C-heater control. Be sure to note the color and location of each connector when reinstalled to the back of the A/C-heater control. Do not force any connector onto the A/C-heater control. Failure to follow this caution can damage the A/C-heater control system.
NOTE: LHD model shown. RHD model similar.
1. Position the A/C-heater control (1) into the instrument panel center bezel (3).
2. Install the four screws (2 and 4) that secure the A/C-heater control to the center bezel. Tighten the screws to 2 Nm (17 in. lbs.).
3. Install the instrument panel center bezel Instrument Panel Bezel - Installation.
4. Reconnect the negative battery cable.
5. Calibrate the A/C-heater control HVAC System Test.