Do you have access to Mitchell1 Prodemand? If you are willing to share user/password (we can pay $250), please get in contact with us ASAP: email operation-charm [[at]] tuta.io or click to submit anonymously. (This is the last day we'll be asking)
Front
FRONT
1. Align the switch pod to the instrument panel center bezel.
2. Install the lower switch pod fasteners(2) to the center bezel.
3. Connect the switch pod electrical connector.
4. Install the instrument panel center bezel, Instrument Panel Bezel - Installation.
5. Connect the battery negative cable.