Operation CHARM
: Car repair manuals for everyone.
Home
>>
Dodge and Ram
>>
2012
>>
Durango 2WD V8-5.7L
>>
Repair and Diagnosis
>>
Body and Frame
>>
Interior Moulding / Trim
>>
Service and Repair
>>
Load Floor - Installation
Load Floor - Installation
INSTALLATION
1.
Install the load floor bin (1) and install the nuts (2).
2.
Position the liftgate
scuff plate
(2) back into the vehicle and seat the retaining clips (1) fully.
3.
Install the load floor lid (1).