Operation CHARM
: Car repair manuals for everyone.
Home
>>
Dodge and Ram
>>
2012
>>
RAM 2500 Truck 4WD V8-5.7L
>>
Repair and Diagnosis
>>
Transmission and Drivetrain
>>
Differential Assembly
>>
Service and Repair
>>
Removal and Replacement
>>
Front Axle - 9 1/4 AA
>>
Differential Carrier Bearings - Installation
Differential Carrier Bearings - Installation
INSTALLATION
Special Tools:
1.
Set differential case (2) on Plug.
2.
Install differential case bearings (3) with Installer (4) and Handle (1).
3.
Install differential case into housing.